Critical Path Program

Critical Path

Takes an Owner from the Planning Stages through Warranty in eight (8) Distinct Milestones in the flow of Planning, Design & Construction.

  • Orientation/Planning Phase
  • Schematic Design Phase
  • Design Development Phase
  • Construction Documents Phase
  • Contractor Selection & Award Phase
  • Construction Phase
  • Commissioning Phase
  • Warranty Phase

Each of the above milestones consist of a number of distinct and important subsets that must be managed properly. Seldom does an institutional or commercial real estate owner have this expertise “in-house” to manage both the Design and Construction Professionals. This is what LEE Construction Consultants provides.

“Action without planning is the cause of all failure. Action with planning is the cause of all success.” —Brian Tracy